Civil Engineer BLOG

Blog on Civil Engineer | Civil Engineering | Construction Projects Management

Subscribe to Civil Engineer BLOG

Civil Engineer Forum

Posted by Civil Engineer On September - 28 - 2008
Welcome to Civil Engineer FORUM If you are not yet a member? Register now! No verification email needed. Decide your username and password. Log in immediately after registration. Happy posting!
Current User: Guest
Please consider registering

 
Search Forums:


 




Construction Scheduling Techniques
Read original blog post

UserPost

3:38 pm
October 3, 2008


Civil Engineer

Admin

posts 120

1

The four project scheduling techniques widely used in construction projects are:
. Bar Charts and Linked Bar Charts
. Network Analysis and Critical Path Method
. Line of Balance
. Q Scheduling

These are briefed below, in which Q Scheduling is now a new technique increasingly applied in construction project management.

1- Bar Charts and Linked Bar Charts;

Bar Charts are the easiest and most widely used form of scheduling in construction management. Even with other scheduling techniques the eventual schedule is presented the form of a bar chart. A typical Bar chart is a list of activities with the start, duration and finish of each activity shown as a bar plotted to a time scale. The level of detail of the activities depends on the intended use of the schedule.

The linked bar chart shows the links between an activity and its preceding activities which have to be complete before this activity can start.

The bar charts are also useful for calculating the resources required for the project. To add the resources to each activity and total them vertically is called a resource aggregation. Bar charts and resource aggregation charts are useful for estimating the work content in terms of man-hours and machine hours.

2- Network Analysis and Critical Path Method

Practically network analysis offers little more than a linked bar chart, though its protagonists claim, with some justification, that the self contained steps of a network are more applicable to complex operations than the bar chart, and that the greater rigor imposed by the logic diagram produces more realistic models of the proposed work. The steps in producing a network are:
- Listing of activities
- Producing a network showing the logical relationship between activities.
- Assessing the duration of each activity, producing a schedule, and determining the start and finish times of each activity and the available float
- Assessing the required resources.

There are now two popular forms of network analysis in construction management practice, activity on the arrow and activity on the node, the latter now usually called a precedence diagram. Each of these approaches offers virtually the same facilities and it seems largely a matter of preference which is used.

3- Line of Balance

The line of Balance is a planning technique for repetitive work. The principles employed are taken from the planning and control of manufacturing processes greatly modified by E. G. Trimple. The basis of the technique is to find the required resources for each stage or operation so that the following stages are not interfered with and the target output can be achieved. The line of balance technique has been applied in construction work mainly to house building and to a lesser extent to jetty work and in conjunction with networks to road works.

4- Q Scheduling

The Q Scheduling is a new technique, though getting rapid popularity among contracting firms. It is the only scheduling technique that reveals a relation between the sequence of doing a job and the cost to be incurred. The Q schedule is similar to the Line of Balance with some modifications made by A. R. A. Z. A in 2004, to allow for a varying volume of repetitive activities at different segments or locations of the construction project, thus the model produced is closer to reality.


Read original blog post



Reply to Topic: Construction Scheduling Techniques

NOTE: New Posts are subject to administrator approval before being displayed

Guest Name (Required):

Guest EMail (Required):

Guest URL (required)

Math Required!
What is the sum of: 2 + 9        (Required)

Topic Reply:


 
 

About the Civil Engineer BLOG forum

Currently Online:

9 Guests

Maximum Online: 27

Forums:

Groups: 5

Forums: 19

Topics: 250

Posts: 320

Members:

There are 867 members

There are 1 guests


Civil Engineer has made 120 posts

Top Posters:

hi-rise - 20

hungsika - 14

ALICE93065068 - 14

Site Engineer - 12

Haseeb Jamal - 11

Administrator: Civil Engineer | Moderators: Site Engineer, DocCoKiem, chocolatemango


© Simple:Press Forum - Version 3.1.3 (Build 356)