The four project scheduling techniques widely used in construction projects are:
. Bar Charts and Linked Bar Charts
. Network Analysis and Critical Path Method
. Line of Balance
. Q Scheduling
These are briefed below, in which Q Scheduling is now a new technique increasingly applied in construction project management.
1- Bar Charts and Linked Bar Charts;
Bar Charts are the easiest and most widely used form of scheduling in construction management. Even with other scheduling techniques the eventual schedule is presented the form of a bar chart. A typical Bar chart is a list of activities with the start, duration and finish of each activity shown as a bar plotted to a time scale. The level of detail of the activities depends on the intended use of the schedule.
The linked bar chart shows the links between an activity and its preceding activities which have to be complete before this activity can start.
The bar charts are also useful for calculating the resources required for the project. To add the resources to each activity and total them vertically is called a resource aggregation. Bar charts and resource aggregation charts are useful for estimating the work content in terms of man-hours and machine hours.
2- Network Analysis and Critical Path Method
Practically network analysis offers little more than a linked bar chart, though its protagonists claim, with some justification, that the self contained steps of a network are more applicable to complex operations than the bar chart, and that the greater rigor imposed by the logic diagram produces more realistic models of the proposed work. The steps in producing a network are:
- Listing of activities
- Producing a network showing the logical relationship between activities.
- Assessing the duration of each activity, producing a schedule, and determining the start and finish times of each activity and the available float
- Assessing the required resources.
There are now two popular forms of network analysis in construction management practice, activity on the arrow and activity on the node, the latter now usually called a precedence diagram. Each of these approaches offers virtually the same facilities and it seems largely a matter of preference which is used.
3- Line of Balance
The line of Balance is a planning technique for repetitive work. The principles employed are taken from the planning and control of manufacturing processes greatly modified by E. G. Trimple. The basis of the technique is to find the required resources for each stage or operation so that the following stages are not interfered with and the target output can be achieved. The line of balance technique has been applied in construction work mainly to house building and to a lesser extent to jetty work and in conjunction with networks to road works.
4- Q Scheduling
The Q Scheduling is a new technique, though getting rapid popularity among contracting firms. It is the only scheduling technique that reveals a relation between the sequence of doing a job and the cost to be incurred. The Q schedule is similar to the Line of Balance with some modifications made by A. R. A. Z. A in 2004, to allow for a varying volume of repetitive activities at different segments or locations of the construction project, thus the model produced is closer to reality.
Read original blog post
sosoft Says:
Куплю Windows Куплю Windows -Vista/XP/2003 sosoft@bk.ru
и другое ЛИЦЕНЗИОННОЕ ПО Microsoft
предложения на е-мейл sosoft@bk.ru
Posted on November 19th, 2008 at 11:35 am
slarmaaccisa Says:
Hi. I repeatedly scan this forum. This is the oldest together undisputed to ask a topic.
How multitudinous in this forum are references progressive behind, knavish users?
Can I worthiness all the advice that there is?
Posted on November 30th, 2008 at 3:39 pm
Niseinnox Says:
I am here at a forum newcomer. Until I read and deal with the forum.
Let’s learn!
Posted on December 3rd, 2008 at 1:36 am
ongisking Says:
where can i get a retaining wall?? i already design a reinforcement for retaining wall…..but i don;t know how to draw it in the autocad file???because i don;t know how to draw the drainage system….mean how the detail of water level of the soil flow away by drawing some pipe…where can i get an example???help!!!
Posted on December 10th, 2008 at 10:28 am
TumpalayToume Says:
Hi
Today turn PC and look that my Miranda client don’t have contact list, It is very bad.
When I connected always received message from contact ONE with Info
_ _ _ _ _ _ _ _ _ _ _ _ _ _
1:
=============================
System Message
=============================
ICQ version 5.1 is no longer supported. Download a free authorized ICQ version from ICQ’s official website.
Who have this problem?
Please advise I can’t send message to my Son
Posted on December 10th, 2008 at 3:06 pm
PVV Gouri Prasad Says:
Dear Friends
I am looking for any article or catalog related to “Varioflor”, where it is used as Retaining Wall / Garden Wall etc., Mostly this is product from Netherlands or Germany.
In fact what i am looking is how it work as Retaining wall, what should be the system of interlocking pattern, which gives it a structural stability.
Is there any prevailing standards?
Thanking you and regards
Posted on December 16th, 2008 at 1:19 pm
QualStaff Engineering Says:
The Civil Engineering Discussion Group (CEDG) is limited to Civil Engineers. We are seeking leading-edge, strategic minded Civil Engineering professionals. This is a forum to confidentially sharing ideas and approaches.
Civil Engineers interested in sharing and developing best-in-class practices are invited to join us. This group is not intended for solicitation of employment or other goals outside of formed purpose. Please contact me with your suggestions regarding this group at andy@qualstaff.com. The direct link to the group is http://www.linkedin.com/groups?gid=1524747
Posted on December 18th, 2008 at 11:26 am
JallGandannow Says:
Hello,
I really like the forum here, and just wanted to introduce ourselves. We offer proof of funds, leased bank instrument, and leased SBLC services.
Our firm works directly with investors which have assets that can be leased to participate in various opportunities such as private placement programs, project financing, private funding and more.
Please take a look our options below:
” Proof of Funds
” Leased Bank Guarantees
” Leased Medium Term Notes
” Leased SBLC (Stand by Letter of Credit)
” Collateral and Credit Enhancement
” RWA Letters, and Verified Blocked Funds
” MT 760, MT 799, PING, SWIFT Verification
” Any other Leased Funds Request
Unlike most of the companies out there, we work directly with the owners of the instruments and funds, and they can accommodate any client’s needs. In addition, the fees we charge for leasing funds are much lower than anyone else, since we are direct with the owners.
If you are interested in working with real people, and avoiding broker chains, please take a look at our website below.
CLICK HERE TO VISIT LEASED ASSETS ., COM
RELATED TERMS:
Leased Bank Instrument, Lease Bank Instruments, or Leasing Bank Instruments, Lease a Bank Instrument, Bank Instrument Leasing, the Bank Instrument Leasing. Leased SBLC and Lease SBLC, SBLC for Lease, Leasing SBLC. Bank Guarantee for Lease, Lease Bank Guarantee , Leased Bank Guarantee, and Leased Bank Guarantees. Leasing Bank Guarantees, MT 760 SWIFT, Swift MT 799, MT 799 SWIFT, or Swift MT 760.
Proof of Funds, Proof of Funds Leasing, Lease Proof of Funds, Leased Proof of Funds, Proof of Funds for Lease, Proof of Funds Letter, Proof of Funds Letters, Proof of Funds Letter Sample, Proof of Funds Statement, Proof of Funds Provider, Provide Proof of Funds, Proof of Funds LLC, Proof of Funds Program, Proof of Funds Canada.
Posted on December 19th, 2008 at 12:48 am
pardede Says:
I just found this site 10 minutes ago,
and seems to be a good site.
Can you share us about your real assignment , or real problem, so everybody can simulate their skill by solving the real assignment you share here?
Let us develop as it is a human’s devotion.
Reg,
Pardede
Posted on December 19th, 2008 at 2:08 pm
Haseeb Jamal Says:
Hi there! This site is a comprehensive one on Civil engineering but there is one more here….. http://www.aboutcivil.com
Posted on December 21st, 2008 at 3:54 pm
Download Free Engineering Books\Ebooks Says:
hi friend…………
For General Purpose I Use this Link http://www.guruengineers.com/articles/download-engineering-books.html. Can anybody recommend any another website to download on vmware subject.
Posted on December 26th, 2008 at 2:56 am
DratryWoorrut Says:
hi fellas
I am going to get a new car. Wish to have a luxury car, but don’t know for sure what to choose… Can somebody advise me something?
Posted on December 29th, 2008 at 3:29 pm
Orinlypeply Says:
There are 5 houses in five different colors
In each house lives a different nationality.
These 5 owners drink a certain beverage, smoke a certain brand of cigar and keep a certain pet.
No owners have the same pet, smoke the same brand of cigar, or drink the same beverage.
The CLUES:
The Brit lives in the Red house.
The Swede keeps dogs as pets.
The Dane Drinks tea.
The Green House is on the left of the White House.
The Green House’s owner drinks coffee.
The person who smokes Pall Mall rears birds.
The owner of the yellow house smokes Dunhill.
The man in the center house drinks milk.
The Norwegian lives in the first house.
The man who smokes Blends lives next to the one who keeps cats
The man who keeps horses lives next to the man who smokes Dunhill.
The man who smokes Blue Master drinks beer.
The German smokes Prince.
The Norwegian lives next to the Blue House.
The man who smokes Blends has a neighbor who drinks water.
The QUESTION:
Who owns the fish?
Posted on January 3rd, 2009 at 4:23 pm